Quiz-summary
0 of 30 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
Information
Detailed Scheduling and Planning
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- Answered
- Review
-
Question 1 of 30
1. Question
In MRP processing, a planned order will be generated when:
Correct
Planned orders are generated in periods where the total requirement is greater than the total availability.
Total requirement = Gross requirement + safety stock; total availability = projected available balance from the previous period + scheduled receipts in this period.
The answer is 4Incorrect
Planned orders are generated in periods where the total requirement is greater than the total availability.
Total requirement = Gross requirement + safety stock; total availability = projected available balance from the previous period + scheduled receipts in this period.
The answer is 4 -
Question 2 of 30
2. Question
If a company buys material in quantities that are equal to the demand over the next 4 periods, the lot sizing technique being used is:
Correct
This is an example of period order quantity. The answer is 4
Incorrect
This is an example of period order quantity. The answer is 4
-
Question 3 of 30
3. Question
High levels of inventory record accuracy will usually result in all of the following except:
Correct
High levels of accuracy will result in fewer surprise shortages, and the level of safety stock will be cut, thus reducing the overall levels of inventory, the risk of obsolescence. While cycle counting may be easier as the problems have been resolved, we cannot afford to reduce the vigilance that achieved this high level of accuracy, so the LEVEL of cycle counting will not be reduced. The answer is 1
Incorrect
High levels of accuracy will result in fewer surprise shortages, and the level of safety stock will be cut, thus reducing the overall levels of inventory, the risk of obsolescence. While cycle counting may be easier as the problems have been resolved, we cannot afford to reduce the vigilance that achieved this high level of accuracy, so the LEVEL of cycle counting will not be reduced. The answer is 1
-
Question 4 of 30
4. Question
Data accuracy is best achieved through which of the following processes?
Correct
In the same way as a cycle count is an audit of the inventory records to dive inventory accuracy, auditing BOMs is the best way to achieve BOM accuracy. 1 and 2 are practices that should be in place, and the audit verifies their completeness and accuracy. 4 will help to maintain inventory accuracy, but the best answer is 3
Incorrect
In the same way as a cycle count is an audit of the inventory records to dive inventory accuracy, auditing BOMs is the best way to achieve BOM accuracy. 1 and 2 are practices that should be in place, and the audit verifies their completeness and accuracy. 4 will help to maintain inventory accuracy, but the best answer is 3
-
Question 5 of 30
5. Question
When using safety lead-time, which of the following statements is true?
Correct
Safety lead time offsets the planned order receipt date from the net requirement date by the duration of the safety lead time. The answer is 3
Incorrect
Safety lead time offsets the planned order receipt date from the net requirement date by the duration of the safety lead time. The answer is 3
-
Question 6 of 30
6. Question
The provision of planned order data to suppliers allows these suppliers to improve all of their manufacturing planning and control systems except for which of the following?
Correct
The provision of this data enables the supplier to plan his business better, therefore it will facilitate options 1, 3 and 4. It will not enable him to better control his production activity, which is done through PAC. The answer therefore is 2
Incorrect
The provision of this data enables the supplier to plan his business better, therefore it will facilitate options 1, 3 and 4. It will not enable him to better control his production activity, which is done through PAC. The answer therefore is 2
-
Question 7 of 30
7. Question
In a process-based layout, lead time reduction is best accomplished by which of the following?
Correct
In a process based, or job shop type industry, the most effective way to reduce lead times is through reducing queues. The answer is 3
Incorrect
In a process based, or job shop type industry, the most effective way to reduce lead times is through reducing queues. The answer is 3
-
Question 8 of 30
8. Question
Which of the following are the primary responsibility or purchasing?
I. Defining the required quality levels
II. Negotiating product prices.
III. Defining service requirements.
IV. Monitoring supplier performance
Correct
I is the responsibility of quality and engineering; III is the responsibility of the materials planner. II and IV are the responsibility of purchasing. The answer is 2
Incorrect
I is the responsibility of quality and engineering; III is the responsibility of the materials planner. II and IV are the responsibility of purchasing. The answer is 2
-
Question 9 of 30
9. Question
A delivery of components has been unavoidably delayed. In a process-based industry, which of the following techniques should the planner use to identify the effect of this delay?
Correct
Full pegging will identify the products that create the demand for this item and that will be affected by this surprise shortage. We will still need to look at the MRP records to identify the material affect of the short in relation to each of those parts, and the routing to identify if enough interoperation time exists to enable a late start of the order for the part without delaying completion (by expediting to reduce queue time etc). The best answer therefore is 4
Incorrect
Full pegging will identify the products that create the demand for this item and that will be affected by this surprise shortage. We will still need to look at the MRP records to identify the material affect of the short in relation to each of those parts, and the routing to identify if enough interoperation time exists to enable a late start of the order for the part without delaying completion (by expediting to reduce queue time etc). The best answer therefore is 4
-
Question 10 of 30
10. Question
The inputs to MRP include which of the following?
I. Finished goods forecasts
II. Bills of material
III. Purchase order data
IV. Material constraint data
Correct
The inputs to MRP are the MPS, Inventory data (which includes open purchase and works orders) and bills of material. The only options opposite that fall into those categories are II and III. The forecasts will be used as an input to the MPS, and material constraints will be an input to RCCP. The answer is 2
Incorrect
The inputs to MRP are the MPS, Inventory data (which includes open purchase and works orders) and bills of material. The only options opposite that fall into those categories are II and III. The forecasts will be used as an input to the MPS, and material constraints will be an input to RCCP. The answer is 2
-
Question 11 of 30
11. Question
When should stock status be updated?
Correct
Stock status should be updated when the parts have been made available for use. Only 3 of the above four options satisfies that criteria
Incorrect
Stock status should be updated when the parts have been made available for use. Only 3 of the above four options satisfies that criteria
-
Question 12 of 30
12. Question
Actual manufacturing lead time is a function of which of the following?
I. Priority
II. Capacity available
Correct
Actual manufacturing lead time will be affected by the urgency of the order – the priority – and the availability or otherwise of capacity to maintain queues at the planned level. The answer therefore is 3
Incorrect
Actual manufacturing lead time will be affected by the urgency of the order – the priority – and the availability or otherwise of capacity to maintain queues at the planned level. The answer therefore is 3
-
Question 13 of 30
13. Question
Immediate inputs to capacity requirements planning are which of the following?
I. Production plan
II. Planned orders
III. Scheduled receipts
Correct
The inputs to capacity requirements planning are the capacity available, the open orders (scheduled receipts) and planned orders. The production plan is an input to Resource Planning. The correct answer therefore is 4
Incorrect
The inputs to capacity requirements planning are the capacity available, the open orders (scheduled receipts) and planned orders. The production plan is an input to Resource Planning. The correct answer therefore is 4
-
Question 14 of 30
14. Question
Common units of capacity include which of the following?
I.Dollars
II.Standard labour hours
III.Standard machine hours
IV.Pieces
Correct
All of the above except money may be used as a measure of capacity. The answer therefore is 3
Incorrect
All of the above except money may be used as a measure of capacity. The answer therefore is 3
-
Question 15 of 30
15. Question
The outputs of an MRP system include which of the following?
I. Order release notices
II. Reschedule notices
III. Cancellation notices
IV. Planned order releases
Correct
All of the above are included in the outputs of an MRP system. The answer is 4
Incorrect
All of the above are included in the outputs of an MRP system. The answer is 4
-
Question 16 of 30
16. Question
Which of the following MRP functions is relevant to the completeness of capacity planning data?
Correct
The only one of these four options that directly affects capacity planning is the generation of planned orders. Each of the other three is how it does that. The answer is 3
Incorrect
The only one of these four options that directly affects capacity planning is the generation of planned orders. Each of the other three is how it does that. The answer is 3
-
Question 17 of 30
17. Question
In the usual scheme of things, priority planning is a function of:
Correct
MRP is said to be a priority planning system – it plans the availability of material at the date of need. CRP assists in this by planning the availability of capacity – but will sometimes plan material availability prior to date of need to enable a balanced workload to be created. Input/output control is a capacity control technique, and dispatching is a priority control technique. The answer is 1
Incorrect
MRP is said to be a priority planning system – it plans the availability of material at the date of need. CRP assists in this by planning the availability of capacity – but will sometimes plan material availability prior to date of need to enable a balanced workload to be created. Input/output control is a capacity control technique, and dispatching is a priority control technique. The answer is 1
-
Question 18 of 30
18. Question
In which of the following situations would the creation of a blanket order be deemed most appropriate?
Correct
Blanket orders are used to reduce lot size by reducing ordering cost. Therefore 1 is true statement – the cost is not the paper, but the time involved in managing all of the information and the actions involved with the paper.
Options 2, 3 and 4 all refer to specific quantities, and so are not as good an answer as 1.
The best answer is 1
Incorrect
Blanket orders are used to reduce lot size by reducing ordering cost. Therefore 1 is true statement – the cost is not the paper, but the time involved in managing all of the information and the actions involved with the paper.
Options 2, 3 and 4 all refer to specific quantities, and so are not as good an answer as 1.
The best answer is 1
-
Question 19 of 30
19. Question
Which of the following will result in a reduction of actual carrying costs of inventory?
Correct
The only way to reduce the actual carrying cost is to reduce the level of inventory. Average inventory = lot size/2 + safety stock, and of the above four options the only one that directly addresses this is option 2.
Eliminating incoming inspection reduces the ordering cost, which in turn CAN lead to a reduction in lot size. Establishing storage points merely redistributes inventory, not reduces it, and reducing the carrying cost factor will enable BIGGER lot sizes which will increase inventory
Incorrect
The only way to reduce the actual carrying cost is to reduce the level of inventory. Average inventory = lot size/2 + safety stock, and of the above four options the only one that directly addresses this is option 2.
Eliminating incoming inspection reduces the ordering cost, which in turn CAN lead to a reduction in lot size. Establishing storage points merely redistributes inventory, not reduces it, and reducing the carrying cost factor will enable BIGGER lot sizes which will increase inventory
-
Question 20 of 30
20. Question
Using ABC analysis to determine cycle counting frequency is an example of which of the following:
Correct
ABC analysis utilizes Pareto’s Law; applied to inventory it states that 80% of the money spent will be spent on 20% of the parts. ABC analysis classifies parts according to their level of importance based on annual spend on each part. Typically every A class part is counted once per month; every B class part once per quarter and every C class part at most twice per year. Inventory planning is carried out by MRP; stockroom management will include cycle counting – but the classifications are set on more than the value of goods in stock. Trend analysis is used to develop forecasts. The best answer is 2
Incorrect
ABC analysis utilizes Pareto’s Law; applied to inventory it states that 80% of the money spent will be spent on 20% of the parts. ABC analysis classifies parts according to their level of importance based on annual spend on each part. Typically every A class part is counted once per month; every B class part once per quarter and every C class part at most twice per year. Inventory planning is carried out by MRP; stockroom management will include cycle counting – but the classifications are set on more than the value of goods in stock. Trend analysis is used to develop forecasts. The best answer is 2
-
Question 21 of 30
21. Question
Which of the following statements is untrue in relation to inventory?
Correct
Inventory is included in the balance sheet as an asset – that is an asset in the financial sense. Therefore 1 is true and 2 is false. Operationally, inventory can be either an asset or a liability: an asset insofar as by operating as a buffer between the different stages in the supply chain it will enable each stage to progress at the pace most suited to it; a liability insofar as we are obliged to make use of the inventory that we have, which may or may not be most suited to the needs of the moment. Therefore both 3 and 4 are true. The best answer is 2
Incorrect
Inventory is included in the balance sheet as an asset – that is an asset in the financial sense. Therefore 1 is true and 2 is false. Operationally, inventory can be either an asset or a liability: an asset insofar as by operating as a buffer between the different stages in the supply chain it will enable each stage to progress at the pace most suited to it; a liability insofar as we are obliged to make use of the inventory that we have, which may or may not be most suited to the needs of the moment. Therefore both 3 and 4 are true. The best answer is 2
-
Question 22 of 30
22. Question
In MRP processing, a planned order receipt will be generated when:
Correct
Planned order receipts are generated by MRP in period where there is a net requirement. A net requirement is generated when DEMAND (the sum of the gross requirements and the safety stock) exceeds AVAILABILITY (the sum of the projected available balance in the previous period and any scheduled receipts in the period being planned). This means that 1, 2 and 3 are all false, and while 4 is not a COMPLETE answer (based on the above statement on when a net requirement exists) it is the BEST answer of the four options given. The answer is 4
Incorrect
Planned order receipts are generated by MRP in period where there is a net requirement. A net requirement is generated when DEMAND (the sum of the gross requirements and the safety stock) exceeds AVAILABILITY (the sum of the projected available balance in the previous period and any scheduled receipts in the period being planned). This means that 1, 2 and 3 are all false, and while 4 is not a COMPLETE answer (based on the above statement on when a net requirement exists) it is the BEST answer of the four options given. The answer is 4
-
Question 23 of 30
23. Question
If a company buys material in fixed quantities that are greater than the average usage, the remaining inventory is called
Correct
Excess stock exist when we have more of an item on hand or on order than there is demand for; Obsolete stock is inventory for which no demand exists and for which no demand is foreseen; slow-moving stock is similar to excess stock. Lot size stock is the excess stock arising from purchasing in quantities greater than the current demand. The answer is 4
Incorrect
Excess stock exist when we have more of an item on hand or on order than there is demand for; Obsolete stock is inventory for which no demand exists and for which no demand is foreseen; slow-moving stock is similar to excess stock. Lot size stock is the excess stock arising from purchasing in quantities greater than the current demand. The answer is 4
-
Question 24 of 30
24. Question
High levels of inventory record accuracy will usually result in
Correct
The greater the degree of inventory accuracy, the less need there is for safety stock to guard against surprise shortages. As the average inventory is Lot Size / 2 + Safety Stock, this will result in a reduction in inventory levels, and a reduction in inventory carrying costs. Therefore 1 is false and 2 is true. Cycle counting helps maintain high levels of accuracy buy identifying the causes of inaccuracy, so 3 is false. 4 is false as shortages can occur from unexpected demand, and accuracy cannot prevent that. The answer is 2
Incorrect
The greater the degree of inventory accuracy, the less need there is for safety stock to guard against surprise shortages. As the average inventory is Lot Size / 2 + Safety Stock, this will result in a reduction in inventory levels, and a reduction in inventory carrying costs. Therefore 1 is false and 2 is true. Cycle counting helps maintain high levels of accuracy buy identifying the causes of inaccuracy, so 3 is false. 4 is false as shortages can occur from unexpected demand, and accuracy cannot prevent that. The answer is 2
-
Question 25 of 30
25. Question
The following two terms can be used in reference to the timing of a purchase order or completion of a shop order
I. Due date
II. Date of need
Which of the following statements is true?
Correct
Before an order is released it is either planned order or a firm planned order. In the case of planned orders, the two dates will NOT differ, but they may do for FPOs.
Statement 1 is false, because either date may change after the order is released.
Statement 2 is true, as we must ensure that goods are available at the time they are needed.
Statement 3 is true, but is not a good answer as there an inference of relying on “chance” to manage our business – not a good idea.
Statement 4 is false, because either date may change after the order is released
Incorrect
Before an order is released it is either planned order or a firm planned order. In the case of planned orders, the two dates will NOT differ, but they may do for FPOs.
Statement 1 is false, because either date may change after the order is released.
Statement 2 is true, as we must ensure that goods are available at the time they are needed.
Statement 3 is true, but is not a good answer as there an inference of relying on “chance” to manage our business – not a good idea.
Statement 4 is false, because either date may change after the order is released
-
Question 26 of 30
26. Question
In a product based layout, lead time reduction is best accomplished by which of the following?
Correct
A product based layout is best represented by a production line. To speed up a production line, it is best to equalize the time needed at each work station, and to reduce the time between completion of a product and the commencement of work on the next product. This is best achieved by 4 opposite – set-up times are practically irrelevant; there are no queues, and equalizing task times may mean that some task times may need to be increased
Incorrect
A product based layout is best represented by a production line. To speed up a production line, it is best to equalize the time needed at each work station, and to reduce the time between completion of a product and the commencement of work on the next product. This is best achieved by 4 opposite – set-up times are practically irrelevant; there are no queues, and equalizing task times may mean that some task times may need to be increased
-
Question 27 of 30
27. Question
Strategic sourcing, rather than tactical buying, is more appropriate in which of the following situations?
Correct
Strategic sourcing is required where there is any risk in terms of availability, technology or price. Only 4 opposite encompasses any of these
Incorrect
Strategic sourcing is required where there is any risk in terms of availability, technology or price. Only 4 opposite encompasses any of these
-
Question 28 of 30
28. Question
Which of the above statements are/is generally true?
I. The higher the level of the component item the more parents it tends to have
II. The lower the level of the component item the more parents it tends to have
III. There is no logical requirement for the low level coding technique to be employed in a net change MRP system
Correct
Statement I is generally false – the lower a component is down the product structure tree (the lower the level on bills of material) the more likely it is that it will be used in multiple products.
Statement II is true, (see above)
Statement III is true as the primary purpose of the low level code technique is to identify to the software that ALL of the possible sources of requirements for the part have been processed. However, a net change system will only replan a part if any unplanned event occurs for that part, so the low-level code is not necessarily needed in that case.
The best answer is 3
Incorrect
Statement I is generally false – the lower a component is down the product structure tree (the lower the level on bills of material) the more likely it is that it will be used in multiple products.
Statement II is true, (see above)
Statement III is true as the primary purpose of the low level code technique is to identify to the software that ALL of the possible sources of requirements for the part have been processed. However, a net change system will only replan a part if any unplanned event occurs for that part, so the low-level code is not necessarily needed in that case.
The best answer is 3
-
Question 29 of 30
29. Question
MRP system outputs serve as valid input to which of the following systems?
I. Shop scheduling
II. Capacity requirements planning
III. Shop floor control
IV. Resource planning
Correct
MRP outputs include a schedule of planned purchase and production orders; and reschedule messages where appropriate for open production and purchase orders. These are used for production scheduling, prioritizing and monitoring orders on the shop floor and for detailed capacity planning. These are options I, III and II respectively. Option IV, resource planning, is carried out at the Sales and Operations Planning process.
The correct answer is 1
Incorrect
MRP outputs include a schedule of planned purchase and production orders; and reschedule messages where appropriate for open production and purchase orders. These are used for production scheduling, prioritizing and monitoring orders on the shop floor and for detailed capacity planning. These are options I, III and II respectively. Option IV, resource planning, is carried out at the Sales and Operations Planning process.
The correct answer is 1
-
Question 30 of 30
30. Question
Which are true statements regarding physical inventories?
I. They are required by outside auditors
II. They are generally very accurate
Correct
Physical inventories are necessary only if an accurate, well-controlled, perpetual inventory system cannot be maintained.
Many studies have shown that physical inventories introduce more errors than they correct.
Incorrect
Physical inventories are necessary only if an accurate, well-controlled, perpetual inventory system cannot be maintained.
Many studies have shown that physical inventories introduce more errors than they correct.